82 Mickelson Drive

Yankton, SD 57078

Phone: (605) 665-3898

 

© 2019 Mead Cultural

    Education Center

June 26, 2015

Tuck-pointing the exterior of the Mead Building continues throughout the summer. This important and time-consuming work improves the exterior of the building by refilling the old mortar, which naturally breaks down over time, between stones. It also adds a cosmetic eff...

June 19, 2015

Outdoor work continues at the Mead Building. Certain projects, such as tuck pointing, can only be done in warm weather months. We have also been busy hosting many visitors at the Museum, particularly with the archery tournament last week. We saw a large group from Hong...

June 12, 2015

This week the workers at Mead have been busy tuck-pointing the rear exterior of the building and more window construction. With the help of up to four state trustees and agreeable weather, a lot is being accomplished. There are many windows to be finished and painted,...

June 5, 2015

This Thursday the Mead Building hosted a tour for a group from the Director of Equalization offices across South Dakota. The group was very interested in all the progress being made at the Mead Building, such as the stencil art and plaster restoration.  The quality of...

Please reload

Archive
Please reload

Search By Tags
Please reload