September 26, 2014

As seen here, a temporary hand rail has been added to the newly refinished front steps of the Mead Building. Grass seed has been planted where recent dirt work was done. The recent rain has given opportunity to see of the dirt work corrected the water infiltration of t...

September 19, 2014

Roger Huntley with Huntley Plastering and Stucco has made repairs to the front steps while the restoration committee researches options for a new ADA railing.  These repairs are to slow and stop deterioration of the front steps during the construction phase.  In a futu...

September 19, 2014

Dirt work around the Mead Building has been completed. The added dirt will help flow the water away from the building, eliminating the water entering the basement. A special thank you to Dr. Brad Kleinsasser for helping move the dirt with his Bobcat. There is still tim...

September 17, 2014

Special Thank You to everyone that attended the 125th Wagon Train tour of the Mead Building,  Yankton's 125th Legacy Project.

September 12, 2014

The front steps to the Mead Building have been repaired and look beautiful. Thanks to a grant from the Mary Chilton DAR we are having new hand rails designed for the steps. Things are really coming together out at the Mead Building. A big thanks to everyone who came ou...

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook App Icon
  • Twitter App Icon
  • Google+ Social Icon

December 28, 2019

December 20, 2019

December 7, 2019

September 23, 2019

September 16, 2019

September 9, 2019

Please reload