Parlor Plaster
It’s time for even more work on plaster restoration at the Mead building. When restoration began the ornate moldings in the parlors were some of the most damaged sections of the building. Recent work adding insulation to exterior walls allows the moldings to be finished. Sections are being recreated or restored by the team at the building. There are many slightly different moldings, so patterns must be created for each area. The lower parlor moldings are being worked on durin